| Customization: | Available |
|---|---|
| Certification: | CE |
| Transmission Type: | Manual |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

XCMG Official Used Concrete Mixer Machines G4806D 7m³ Volumetric Concrete Mixer Truck
Particular mixing technology with continuous trace,original double log spiral technology with changeable lift angle and changeable screw pitch and optimized auxiliary blades and pressure-reducing hole design can make the operation path of the spiral in perfect state and can ensure the best concrete flowing trend in mixing drum and more uniformly discharging.
Optimized chassis matches with upper parts and such parts as front base andaccessory beam, rear base and tilted beam, rear base and accessory beam adopt integration design. After force bearing research and analysis and long-term application, the best position of the connecting point between tilted beam and rear base are confirmed and thus deformation and break of cross beam can be avoided effectively.
| Standard parameters | |||
| Equipment Model | G4806D | Model Abbreviation | 4806 |
| Volume range | Less than 8m3 | Power type | fuel |
| Engine | |||
| Model | MC07H.35-60 | Rated power (kW/r/min) | 257/2200 |
| Maximum torque (N·m/r/min) | 1400 | Displacement (L) | 7.36 |
| Fuel types | diesel fuel | ||
| Vehicle parameters | |||
| External dimensions (length × width × height) (mm) | 10300×2525×3995 | Equipment weight (kg) | 14500 |
| Tire specifications | 11.00R20 | Chassis Brand | Sinotruk Howo |
| Rear axle description | VGD75 | ||
| Stirring tank parameters | |||
| Stirring volume (m³) | 7.5 | Vehicle Announcement | XZS5310GJBC1Z |










1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted.
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC.
3: What about the delivery time?
A: 7-30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.